You are viewing a single comment's thread from:
RE: Does the 13 week powerdown period prevent investing in STEEM?
Actually, it can't be configured in SMTs..
Oh, I assumed that was included in the configurable parameters. I think there's a strong argument to be made for making that configurable in future updates.