Folder preparation

in #sct5 years ago

The preparation of folder is the first step for loop test activity and it is very essential.
Required drawing/documents are depend on contractual agreement. However, in general, below listed are the most required.
All the drawing/document should be approved and latest version.

Check sheet
PID
Loop diagram
Connection Diagram
Alarm and set point list
Calibration report
Data sheet
Construction complete certificate
Others

checklist-2077020_1920.jpg
Document cross checking is required to reduce the wasting time during pre/official test.
Once all the test is done, company will sign on check sheet and the hole folder will be scanned for hand-over document.

Sort:  

Congratulations @loop-manager! You have completed the following achievement on the Steem blockchain and have been rewarded with new badge(s) :

You made more than 10 comments. Your next target is to reach 50 comments.

You can view your badges on your Steem Board and compare to others on the Steem Ranking
If you no longer want to receive notifications, reply to this comment with the word STOP

To support your work, I also upvoted your post!

Vote for @Steemitboard as a witness to get one more award and increased upvotes!

Coin Marketplace

STEEM 0.20
TRX 0.20
JST 0.034
BTC 89955.66
ETH 3105.10
USDT 1.00
SBD 2.98