Sondering test (CPT) and Hand Bor test
The construction project of ADM Lampulo Building, Banda Aceh.
Sondering test first point (SO-01)
Sondering test the second point (SO-02) The long distance of first and second point is about 100m
While the hand drill is done when the sondering test is done, just do the hand drill job, because the hand drill is aimed to take soil samples to do the laboratory check.
good bandaaceh I will give you
0.020 SBD vote
Resteem your post to my 2200 plus followers
give you 20 to 30 upvotes
i will follow you
In just 0.050
If you want to learn how to earn 1 SBD to 3 SBD in single day Don't waste your time and contact me on Discord : farhannaqvi7
okay, I've upvote @farhannaqvi7
This post has received a 57.90 % upvote from @fredrikaa thanks to: @good-bandaaceh.
Thanks for you @booster