Photography of most beautiful and historical place of Bangladesh

in #photography7 years ago

Hardinge Bridge Information Description

image
In 1889, proposals for the construction of a bridge on the Padma river were proposed to simplify the communication of Assam and East Bengal along with the undivided India's Calcutta. After 20 years of discussion, the proposal was accepted in 1908. Though the proposal was meant to build a single line bridge, the dual line was kept in final design and constructed.
image
It is one of the bridges in Bangladesh. The construction of this bridge began in 1910. Construction of the bridge was completed in 1915, which means it takes six years to build this bridge. The bridge was inaugurated on 4 March 1915.
image
About 24 thousand manpower was needed to build this bridge. The total length of the bridge is 1.81 km. This railway has 296 feet of railway level. The experimental first train was run on the downstream line of the bridge on 1st January 1915.
image
Under the bridge, the navigation system is very naturally placed. Under the bridge the headway is 40 feet for navigation.

For add some points

Please upvote,comment and Follow me

Sort:  

@therealwolf 's created platform smartsteem scammed my post this morning (mothersday) that was supposed to be for an Abused Childrens Charity. Dude literally stole from abused children that don't have mothers ... on mothersday.

https://steemit.com/steemit/@prometheusrisen/beware-of-smartsteem-scam

sneaky-ninja-sword-xs.jpg
Sneaky Ninja Attack! You have just been defended with a 6.96% upvote!
I was summoned by @munirhossain. I have done their bidding and now I will vanish...

woosh
A portion of the proceeds from your bid was used in support of youarehope and tarc.

Abuse Policy
Rules
How to use Sneaky Ninja
How it works
Victim of grumpycat?

Coin Marketplace

STEEM 0.21
TRX 0.26
JST 0.039
BTC 98628.81
ETH 3457.37
USDT 1.00
SBD 3.21