Most wanted Padma Bridge

in #padma6 years ago

image
source
Mawa of Munshiganj district, Shibchar of Madaripur district and Jajira in Shariatpur district are celebrating the festival. It's a dream-implementation festival. The work is going on in the night and on the banks of the Padma river. The construction work of the Padma bridge is going on in full swing. The army is supervising all the construction work of the bridge. The government's plan is to open for the transport of the Padma bridge at the end of the year 2018. Padma Bridge There are many people's interest in this bridge. The information provided by the Ministry of Road Transport and Bridges provides information about the Padma bridge project-
Which is in the Padma?

  1. Padma bridge project named Padma Multipurpose Bridge Project
  2. Padma bridge type is double-faced. This bridge is being constructed with concrete and steel.
  3. Total cost of the Padma bridge project (main bridge) 28 thousand 793 crore 39 lakh
  4. The government allocated Tk 524 crore for the fiscal year 2017-18 in the Padma project.
  5. River governance cost 8 thousand 707 million and 81 million taka for Padma bridge project.
  6. China Railway Group Limited is the name of the company contracted in Padma bridge project.
  7. The Padma Bridge will have gas, electricity and optical fiber connection transportation facilities.
  8. Padma Bridge will be installed on the bottom floor.
  9. The width of Padma bridge will be 72 feet, it will have four lane roads. image
    source
  10. The length of Padma Bridge is 6: 15 kilometers.
  11. Vedadct 3 km 18 kilometers of Padma Bridge
  12. The bridge connecting the Padma Bridge at two points (Jazira and Mawa) 14 kilometers.
  13. The Padma bridge project has been ruled by river system at two to 12 kilometers.
  14. About 4,000 people are working on the Padma bridge project.
  15. Viaduct pillar 81 of Padma Bridge
  16. From the water level, the height of the Padma Bridge will be 60 feet.
  17. The piling depth of Padma Bridge is 383 feet.
  18. The total number of pillars in the Padma bridge is 42.
  19. Six piers for every pillar
  20. The total number of pilgrims in the Padma Bridge is 264.
  21. Construction of Padma bridge will end in December 2012
Sort:  

Go here https://steemit.com/@a-a-a to get your post resteemed to over 72,000 followers.

Coin Marketplace

STEEM 0.19
TRX 0.18
JST 0.033
BTC 88380.57
ETH 3082.21
USDT 1.00
SBD 2.72