The Daily Pen #30, The Upcoming List of Home Construction ProjectssteemCreated with Sketch.

in #neoxian5 years ago

Unix Epoch: 1565645835

To Do

Here are a few of the home repair projects that I will continuing once the kids start school in a few weeks. I'll report on the progress regularly as time goes on.

  1. Finish upstairs bathroom including recessed sink install
  2. Install shelves in kid's bedroom closet
  3. Install copper pipe for switch over from forced hot air to baseboard hot water
  4. Repair kitchen faucet

The upstairs bathroom is in the most dire need of completion. Last fall I managed to remove the old piping and floor. I got as far as install of a new toilet flange and outlet. However, I've had significant problems properly positioning the new wye adapter to ensure 1/4 inch per foot slope toward the stack.

So, this fall I'm going to need to rip out the wye adapter yet again... and give it a try one or two... or probably 5 times... until it's correct.

Bathroom Progress so Far

old_bathroom.jpg
Before major deconstruction

old_pb_bend.jpg
Old lead closet bend with rotted flange

toilet_removed.jpg
Old rotted flooring under toilet

new_floor_flange.jpg
New floor and flange (below)

new_floor_toilet.jpg
New flooring and toilet (above)

Coin Marketplace

STEEM 0.20
TRX 0.19
JST 0.034
BTC 91499.04
ETH 3111.94
USDT 1.00
SBD 2.89