[House building diary] Burying sewer pipes
Another mega project and another personal record. I apparently do not have a different way :)
This time I needed to lay sewer pipes from the house to the border of the site.
I dug the 100 meters trench for an electric cable for half a year, then dug 20 meters trench for a water supply for a week, now I dug 30 meters for sewage in 4 hours :) And another 5 hours it took to lay pipes.
I worked as usual, alone, without the involvement of technology. As tools - a shovel and 2 such devices
I soaped the edges of the pipes with liquid soap to make it easier to join them
And the board was used to insert these pipes into each other with a light kick.
As I said, after 5 hours, the work was finished. The pipes are laid in the ground and buried.
I didn't have the strength to level it out carefully. I'll make it later.
That's all for today.
Congratulations @astrizak!
Your post was featured on our daily build newsletter. We've sent 250 liquid BUILD tokens from our @build-it.funds account to your wallet upon which you can sell, trade or buy on steem engine or SteemLeo.
Build-it is a DIY (do it yourself) platform where you can find tons of how-to's, ideas, and advice to create or build something all by yourself. The platform leverages a robust digital token, called the BUILD. The recommended tags required when creating a DIY article are #diy, #build-it. #how-to, or #doityourself. Please subscribe to our HIVE community here and earn extra 'HIVE' tokens.
Chat with us on our discord and telegram channels Discord, Telegram.