Construction of electric hydroelectric power plant, takengon Aceh-Tengah

in WORLD OF XPILAR3 years ago

Hello Everyone


Construction of peusangan hydropower is a project that has been done since 1998, but then stopped because of the first aceh conflict, the devastating earthquake and tsunami that occurred in Aceh at the end of 2004 also made the technical construction of this hydropower plant was reviewed, so that in 2011 the construction process has only resumed, until now.


IMG_20210519_011025-01.jpeg

IMG_20210519_011259-01.jpeg


The area of hydroelectric power plant (PLTA) peusangan in silih nara area, takengon central aceh district, continues to be accelerated development to generate electricity 86 MW to more.


IMG_20210519_011349-01.jpeg

IMG_20210519_011221-01.jpeg

IMG_20210519_011430-01.jpeg


Here's my story today, about the construction of peusangan hydroelectric power plant.Thank you for visiting me.

Coin Marketplace

STEEM 0.20
TRX 0.14
JST 0.029
BTC 67443.68
ETH 3234.73
USDT 1.00
SBD 2.65