Development Achievements 05 - Steemit Assisted Village and Build a Mushalla AL-Qariah in Aceh

in WORLD OF XPILAR3 years ago

desa binaan.jpg


Steemit Assisted Village and Build a Mushalla AL-QARIAH
With Photographer Steem Blockchain
World Of Xpilar Community


Achievement Activities. Date : 23 s/d 27 May 2021


Today, I will show again the progress of building a mushalla in Buket Village, which we are doing slowly with World Of Xpilar Members in the local Aceh Team joint.

This achievement is, of course, thanks to all the support from friends, especially from the Voters of this Post and the Contributions of Steem and Sbd, as well as being followed by the Spirit of Body Power in real time in the field.

This achievement, the continuation from here Achievements 04,until it has formed a building that you will see, in the arrangement of the image below of course.

In this activity, I would like to show all of you some of the activities I combined over the past few days, up to this day.

below, you'll see, activities like :

1 . Ordering Stage 2 Mushalla Pole
2 . Installation of Advanced Mushalla Pole
3 . Adjustment of Kosen and Brick Laying
4 . Purchase of Cement and Iron


Ordering Stage 2 Mushalla Pole


Below, you will see, some of the mushalla poles ordered have arrived, because, previously, the pillar in question was still lacking, so there were several poles in addition.

let's see the picture below.


IMG_20210523_133639.jpg


IMG_20210523_133526.jpg


IMG_20210523_133541.jpg


IMG_20210523_133551.jpg


IMG_20210523_133612.jpg


Adjustment of Kosen and Brick Laying

Development Date: 23-05-2021


Below, you will also see, completion of the ongoing stages, from the construction of bricks for the walls to the setting of the window sills.

Below, you will see, all the activities, in the picture. let's take a look at it below :


IMG_20210523_091017.jpg


IMG_20210523_091022.jpg


IMG_20210523_091036.jpg


IMG_20210523_102104.jpg


IMG_20210523_102114.jpg


IMG_20210523_102120.jpg


IMG_20210523_102124.jpg


IMG_20210523_102133.jpg


IMG_20210523_102135.jpg


IMG_20210523_112632.jpg


IMG_20210523_112700.jpg


IMG_20210523_112648.jpg


IMG_20210524_165918.jpg


IMG_20210524_165952.jpg


IMG_20210524_170137.jpg


Installation of Advanced Mushalla Pole

Development Date: 26-05-2021


In installing the poles, it takes two days of completion, because, it is built in stages, to make it tidier and stronger, because, this pole will function to support the weight of the roof, which will be installed in the next few days. "The roof is still under design"


IMG_20210526_101034.jpg


IMG_20210526_101042.jpg


IMG_20210526_101051.jpg


IMG_20210526_163850.jpg


IMG_20210526_163908.jpg


IMG_20210526_174555.jpg


IMG_20210526_174607.jpg


Further Installation of Mushalla Pole

Development Date: 27-05-2021


continued, you will see directly in the image below:


IMG20210527150251.jpg


IMG20210527150319.jpg


IMG20210527150327.jpg


IMG20210527150355.jpg


IMG20210527150541.jpg


IMG20210527151529.jpg


IMG20210527162848.jpg


IMG20210527162906.jpg


IMG20210527162929.jpg


IMG20210527162946.jpg


IMG20210527163234.jpg


IMG20210527163258.jpg


IMG20210527170053.jpg


IMG20210527170113.jpg


IMG20210527170128.jpg


Purchase additional cement "Date: 23-05-2021


below, you will see again, several stages of material requirements, such as:

  • cement
  • iron

which is still lacking, let's look at it below :


IMG_20210523_111540.jpg


IMG_20210523_111546.jpg


Additional purchase of cement and iron "Date: 26-05-2021


IMG20210526125014.jpg


IMG20210526125026.jpg


The Final Result of Achievement


At the end of this section, the achievements that have been made are banned as in the picture below, this construction will continue tomorrow, because some materials are still lacking, such as:

  • brick

Mushola Pole Completed
Picture below :


Installation of Mushalla Pole has been completed.
below is the picture.


IMG20210527163234.jpg


The front prayer room wall continued Tomorrow
Picture below :


some parts of the wall, still not filled with bricks, this is due to adjustment, there is still a lack of bricks ordered beforehand, to fulfill the picture below, in the upper section, on the left. which is still lacking.


IMG20210527162848.jpg


Mushola wall in continuation Tomorrow
Picture below :


Likewise with the image below, you can see it, from the point of view of the eye, like:

the inside, the bricks are still lacking, to fill up to the top, left side and right side. below is the picture:


IMG20210527170128.jpg


After some of the points above have been done tomorrow, then, the next one will be done as below.

Advanced Stages of Development :

  1. Plaster of the walls of the prayer room "front and back"
  2. Designing beams, for the roof of the Mushalla.

That is what I can say, in achieving the construction of a Mushalla and Children's Education Center in this village. I hope that in its development, this village will get more support from all Steem users.

Thus, the brief explanation above, in the joint activity of building a place of worship and an educational place for children in Buket Village, I hope you will be happy to see them.

Requesting assistance from:

Hopefully this project submission will receive support from all parties.

A big thank you, from me representing the World Of Xpilar Community
who have helped in the form of field workers, during this development, including the people of Buket Village


Hilsen

@sultan-aceh
Responsible Field
World Of Xpilar community


100% Voting for this post, will be given for Financing to Assisted Steemit Villages and Build Mushalla


IMG20210527163234.jpg


Donation List Development Achievements 04


List- NameSTEEMSBD
1. @xpilar100-
2. @hingsten100-
3. @sa1photography-1.400
Total2001.400


Donation List


List- NameSTEEMSBD
1. @xpilar100-
2. @hingsten100-
3. @digitals-photo-4
4. @jasonmunapasee-3
5. @adi.pisces-2
6. @muliadi988-
7. @adivender-1
8. @partner-macro-1
9. @grisaia-steem-1
10. @lensaphoto-1
11. @syawalkoki-1
12. @idayrus-1
Total20815


DONASI FROM BUKET VILLAGE PEOPLE


List- NameCementNote
1. Cement11Villagers

Management


1Responsible Fields@sultan-aceh
2Treasurer for Development@jasonmunapasee
3Checking Assistance Fund Transactions@grisaia-steem
4Field Inspectors@digitals-photo
5Information and Documentation@adi.pisces
6Implementation withMembers @aceh-team

Development Information


DevelopmentPlaces of Worship and places of Education
LocationBuket Village
Support@dobartim - @xpilar - @stephenkendal - Team Norway
SurveiCommunity @worldofxpilar - @aceh-team and @sultan-aceh

aceh-team.png

Sort:  
 3 years ago 

Hello dear friend @ sultan-aceh good afternoon
What they are doing is worthy of admiration, congratulations to the entire team who make a great effort to carry this forward.
I really appreciate that you let us know about the trailer.
have a beautiful afternoon

thank you so much Jlufer
great to hear :)

Semoga cepat selesai bangunan musalla alqari'ah amin..

Alhamdulillah ... terima kasih banyak

Alhamdulillah, proses pembuatan musholla ini berjalan lancar, semoga cepat selesai seperti harapan kita semuanya 👌👌👌

Alhamdulillah ... terima kasih banyak

Sama-sama bang @sultan-aceh 👌👌👌

Alhamdulillah sampai saat ini berjalan dengan lancar, semoga kedepannya berjalan lebih lancar lagi, dan semoga mushalla ini cepat dapat digunakan sehingga anak-anak didesa tersebut lebih cepat mendapatkan tempat pendidikan yang layak. amin

Alhamdulillah ... terima kasih banyak

sama-sama :-)

 3 years ago (edited)

MashaAllah You're doing a great job sir @sultan-aceh hats off

thank you so much @shohana1
Allhamdulillah ... This was achieved thanks to the support of Voices and Donations and the prayers of all users at Steem. including you @shohana1 :)

Alhamdulillah, Allahumma Ameen! I pray to Almighty Allah for more success on your honest projects and donations. 💖

Alhamdulillah, the work has been done so far. I hope this work will finish quickly.I am proud of you @sultan-aceh . what you do is very useful to all of us. We as aceh-taem members are very grateful to everyone who has supported us so far and very much also to @xpilar . Who always supports us all. We as members of aceh-taem will always support and assist you. Continue to fight together.

SEND REGARDS FOR SUCCESS

Alhamdulillah ... terima kasih banyak

Alhamdulillah, the construction of the musholla is going well, and I hope the construction of the musholla will be completed quickly :)

Alhamdulillah ... terima kasih banyak

Semoga cepat selesai, dan dapat di pakai secepat nya, @sultan-aceh

Alhamdulillah ... terima kasih banyak

Sama-sama bg,,

Alhamdulillah progresnya semakin meningkat

Alhamdulillah ... terima kasih banyak

Semoga berjalan dengan lancar

Alhamdulillah ... terima kasih banyak

Coin Marketplace

STEEM 0.21
TRX 0.20
JST 0.033
BTC 96864.77
ETH 3282.21
USDT 1.00
SBD 3.01