Construction Site III

in Italy3 days ago

The meson work was finally completed today. I wasn't around but I later visited the site in the evening hour to inspect what what they have done.

I noticed that two more steps were added ok the block that positions outside. They will be used as design for pillers which would be buried inside.

The block work inside was also taken to the right level with others and a window was carved out on the outer side.