World Smile Project : Construction of Free Education Center - Update November 09, 2021
The percentage of completion of the construction of the free education center this time experienced a very significant increase starting from November 4 to today, where today after conducting a construction engineering analysis it has reached 80% of the total. I can say this because the construction of this free education center only leaves 4 items out of 12 main work items.
The 4 items that are being and will be carried out in the past few days are the installation of electrical installations which have reached 70%, where the rest is the installation of lights and mains electricity, this installation will be considered 100% when the ceiling work is also completed.
From the results of the construction engineering analysis and when taken into account with the constraints in the construction site of the free education center, it is targeted to be completed no later than the end of November, this refers to 3 main work items that will soon be carried out, namely the installation of ceilings along with the installation of lights and currents. main power. While the stairs will be done simultaneously with painting which is the finishing of this development.
Below I also attach in a table form about the 12 main jobs that have been, are being and have been completed by the workers with the code Complete which means it has been completed perfectly, Almost Complete which means being done and almost finished, and On Progress is the work to be done in the near future and the material inventory is already on site.
Apart from the table I explained, I also attach photos of the progress achieved as of today for the public to consume for the sake of transparency of the World Smile Project program.
Number | Type of work | Notes |
---|---|---|
1 | Pole or Column | Complete |
2 | Lower Beam | Complete |
3 | Floor Adhesive | Complete |
4 | Floor | Complete |
5 | Wall | Complete |
6 | Top Beam | Complete |
7 | Trestle | Complete |
8 | Roof | Complete |
9 | Stairs | On Progress |
10 | Ceiling | On Progress |
11 | Electrical installation | Almost Complete |
12 | Painting | On Progress |
Perspective | Present Condiition |
---|---|
Front View | |
Front and Right View | |
Right View | |
Front and Left View | |
Left View |
Inside View | Inside View |
Electrical Installation | Electrical Installation |
Electrical Installation | Electrical Installation |
Project Name | Free Education Center |
---|---|
Beneficiary | Khairul Huda School Boarding |
Address | Syamtalira Aron, North Aceh - Indonesia |
Related Links
World Smile Project : Construction of Free Education Center - Update November 04, 2021
World Smile Project : Construction of Free Education Center - Update November 01, 2021
World Smile Project : Construction of Free Education Center - Update October 26, 2021
World Smile Project : Construction of Free Education Center - Update October 24, 2021
World Smile Project : Construction of Free Education Center - Update October 20, 2021
Note:
- Construction progress updates will be presented for budget transparency
- Completely update budget expenditure can be seen in @miftahuddin's post (Free Education Center)
- Total Budget Revenue and Expenditure from the World Smile Project is handled by @heriadi and @irawandedy
- All documents have been authorized by the relevant parties
- Documents in the form of photos or writing must have permission from World Smile Project team
Cc : @steemcurator01 @steemcurator02 @pennsif @el-nailul @mariana4ve
Thanks
@klen.civil
I really like this project of yours. It will work well for the education of neglected children. I want to help you with the projector.
People continue to do this for the people, I will always be by your side inshallah.
Insha Allah
It is good to know that people like you support these projects that so much need these works for their education, best regards.
Very good initiative for free education, which is the most eloquent for children to have quality education wherever it is.
Hampir 90% selesai ya bg, untuk proses loteng kiban bg nyan?
Dalam proses pemesanan
Mungkin meu padum uroe teuk katrok.
Oh get that bg,loteng pu rencana ne pasang bg?
PVC kamo neuk pasang
Keren that entek bale nyan bg 👍👍
Terima kasih
Keren bg, setelah pembangunan rampung 100% bisa dilanjutkan kegiatan amal selanjutnya.
Muantap
#club5050
#worldsmileproject50pc
Aamiin
Beautiful plan to undertake such a beautiful project. Thank you and best wishes to all the community admins and moderators.
Thanks a lot
It's a very good initiative❣️
Thanks a lot
Pajan peresmian nyan...?😁
Tapreh siap ile bg
hehehe
Mantap.....👍
👌
Wah udah hampir selesai juga ya balai nya 🤗. Mantap Two thumb up for all team work. Ganbatte 💪💪
Terima kasih kakak
With my pleasure adoe 🤗
😊😇
#club5050 😀 😀
Thanks a lot
#club5050
Hermoso felicitaciones, bendiciones para todos.
Thanks a lot