The Story of Fence Wall | Part 3
Photo by Maarten Deckers on Unsplash
I shared two parts regarding our newly built wall fence. Today, I am going to share the third part of the story.
When I last stopped the story, I shared how the stripes across the main columns were going. Once finished with the main columns, it started the moldings on top of the columns. This needed much time to ensure the lines were at the same level. Also, each layer had to dry well before the next layer was placed. Masion had to carefully and neatly do his job even under the burning sun.
Along with the columns, these stripes were also made on the wall. Meanwhile, we had to endure some rainy days as well.
Once all layers were done, the final molding started. This one was applied only along the wall. Masion proposed a three-square design, which was instantly accepted by us.
After that, the finishing part began. First, he plastered the foundation wall with black cement to enhance the appearance. Then, all edges were smoothed. We had to place a glass to make the water meter visible from outside. The smaller gate was also decorated with some stripes and patterns.
Even though the activity took longer than we thought due to rain and some other circumstances, the output came out neat and perfect.
Now, the next step is to paint and install the gate.
Upvoted! Thank you for supporting witness @jswit.
I am thinking about the gate. It will be an automatics one ???
Nope aiya. Just a normal one to be placed.