THE DIARY GAME - AUGUST 14, 2021  : POTENTIAL IN GEULUMPANG VII VILLAGE & SUPERVISION OF BUILDING CONSTRUCTION

in Steem SEA3 years ago

20210814_121751.jpg
Glossy black palm fruit

20210604_154219.gif

50% Pembayaran Postingan ini Untuk @steem.amal

20210604_154219.gif

Hi Steemian friends good afternoon

The author on the day went to Geulumpang VII Village, Matangkuli District, North Aceh Regency, Aceh Province to supervise the construction of buildings that have finished laying bricks while at the same time seeing the natural potential that exists. It turns out that here many betel nut trees have begun to bear fruit as a result of the efforts of the community to plant them, there are also palm trees that have shiny black fruit. On the vacant lot I saw a bamboo tree growing tall with very dense leaves. This bamboo is a potential raw material that can be processed into various kinds of handicrafts. Skilled workers can make bamboo into mats, baskets, around the people's rice fields, I saw rice field fences made of bamboo woven around, and many more can be made from bamboo raw materials

20210814_124446.jpg
The potential of many betel nut trees belonging to the villagers

20210814_121957.jpg
The potential in the village has a lot of bamboo plants

Utilization of natural products to meet the needs of people's lives. The importance of increasing community capacity with the theme Skills to process bamboo raw materials into finished goods that are ready to be sold in the market. After surveying the advantages of various things in the village then it must be a provision to study what kind of skills training is needed by the villagers. Creating new job opportunities with the natural advantages of each village is a very superior solution in the midst of the COVID-19 pandemic

20210814_121756.jpg
Palm fruit is very good

I also saw a handyman constructing a building and having discussions with the supervisor. They read the picture then discuss it in detail and accurately. The head craftsman made an offer for the wages of workers so that they could work to complete the building within 3 months and the building owner felt that the wage offer requested by the head craftsman was not expensive or mutually beneficial. Materials that are already in the field include bricks, cast sand, iron and it looks like there is a mixer machine for mixing cement that has stopped, it looks like it was used when the builders did the concrete casting.

20210814_123409.jpg
The handyman is reading the drawing of the building work plan

20210814_123624.jpg
The existing brick material at the building construction site

20210814_123508.jpg
Buildings in progress

Construction workers are seen being built in several stages depending on the available funding sources. The bricklaying items and the installation of door frames and window frames have been completely completed. The head craftsman said he would complete the roofing work item within ten days.

The link to the location point I visited was Glumpang VII, North Aceh Regency, Aceh, Indonesia:
Google Maps
What3words
Plus.Codes
373X+5Q Jeumpa Glumpang VII, Kabupaten Aceh Utara, Aceh, Indonesia

20210814_121623.jpg
Fallen betel nut

Thus the author writes about supervising the potential in Geulumpang VII village as well as meeting craftsmen who work to build buildings and hopefully it will be useful

Special greetings always to all my Steemian friends

20210604_154219.gif

👉@waterjoe
Tentang Saya
20210604_154219.gif

20210507_170027.gif

Coin Marketplace

STEEM 0.21
TRX 0.20
JST 0.035
BTC 91274.52
ETH 3158.75
USDT 1.00
SBD 3.10