GAChain Weekly Report (2018/10/08–2018/10/12)

in #gachain6 years ago

微信图片_20180725165239.jpg

GAChain latest news

2018.10.08

GAChain was invited to Zhongcheng new industrial zone opening ceremony, stating GAChain’s layout in industrial internet.

签到1.jpg

Technology and Projects Progress

E-Nanshan Government Project

Front-end

  1. Optimized the problem of slow menu loading after login;

  2. Displayed the first menu in accordance with permissions after login;

  3. Modified the page of event schedule;

  4. Added message notification and data sheet validation in accordance with design drafts;

  5. Added data dictionary code enable/disable function;

  6. Solved operation permission display problem on event catalogue page;

  7. Fixed relevant bugs of event deployment;

  8. Accomplished the correction and withdrawal function of events.

Back-end

  1. Event registration column displayed published events only ;

  2. Corrected the event configuration checking list interface;

  3. Reset manual input of item code and sub-item code;

  4. Fix permission bugs in accordance with testing permission;

  5. Shielded deleted units interface;

  6. Added events pending withdrawal function;

  7. Restored draft editing;

  8. Encrypted on-chain data.

Test

  1. Conducted test of events pending and processing, uploaded bugs to TAPD;

  2. Conducted permission test, uploaded bugs to TAPD;

  3. Retested modules of homepage, background management ( unit management, user management, character management and menu management);

  4. Retested modules of enterprise units management, data dictionary and holiday management;

  5. Regression test of fixed bugs on TAPD;

  6. Deployed server test environment of North-China Alibaba Cloud;

  7. Testing manual function of registration window;

  8. Tested on-chain contracts, uploaded bugs to TAPD.

微信图片_20180206122612.jpg

GAChain

  1. Fixed security problem of digital signature;

  2. Fixed problems of permission and character validation;

  3. Optimized system parameters;

  4. Optimized parts of data sheet types;

  5. Optimized basic applications and data transmission;

  6. More information logs added;

  7. Deleted parts of useless interface.

Client:

  1. Transaction logic generation function added;

  2. Fixed notification and incorrect notification number issues;

  3. Fixed scroll bar and label display issues;

  4. Adjusted interface routing and built deployment logic.

Coin Marketplace

STEEM 0.20
TRX 0.26
JST 0.039
BTC 100331.97
ETH 3646.26
USDT 1.00
SBD 3.05