Road Construction-Factor that causes Transportation Error.

in #engineering6 years ago

This picture was taken about 2-3 weeks ago. We were assigned to capture or to take a pic about some of the parameters and factors that can affect the transportation flow.
20181013_201812.jpg

This one caught my eye while going to a friends boarding house. This narrow road is a two-way road. The flow of traffic in this place is not that heavy not until this road was being constructed. From school going to a friends boarding house will took us about 10-15 minutes of ride. But when they started this construction, it will took 20-30 minutes for you to get to your destination.

This heavy equipment seen on the image has been there for the whole duration of my visitation at my friends boarding house which means that since the time that I have captured this image, there was still no progress in their work.

My very point here is that it is good that the government is taking action towards the betterment of such place but they should at the very least, fasten their work because it causes too much delay for those students and workers passing through that road.

Captured at Urgello St. Cebu City
Captured using Oppo A83.

Coin Marketplace

STEEM 0.21
TRX 0.20
JST 0.034
BTC 90603.36
ETH 3085.35
USDT 1.00
SBD 2.98