You are viewing a single comment's thread from:
RE: Calculation of production capacity hammer driver pile
soil bearing capacity should first be calculated
so we can determine the depth and type of foundation what is needed
the above calculation is just an example and can be tailored to the needs of the field
eg efficiency factor and others
hopefully, this explanation can be useful :)