The idiot project ... or rebuilding a 350m² house - Part 4
#The idiot project ... or rebuilding a 350m² house - Part 4
here we go again.
After the floor was done and the main construction of the wall frames were in place it was about time to get started with the construction of the bathrom.
Basic frames for the shower
Making space for the sewer connection
and going on with insulation and plasterboards
little shelves for the shower
shower water pipes and grounding
some fun ;)
fixing the ceiling
wow ..a wall !
constructions for the washing facilities, pipes and grounding cables going in, water connection getting in place
frame for the mirror with backlights
covering the toilet and washing facility area
bang!
one piece missing
filler going in
Building the washing stand
walls covered and filled
Mirror mirror on the wall
Let there be light!
Stay tuned .. we'll be back in a moment ...