Deck Construction! 3 Days pressure build =)

in #construction7 years ago

Hi Steem Folk,

Here's a little construction tale from last week. The Client wanted a 10x3m deck built in 3 days due to him needing the space ready.

We started off slowly because the space because was very tight, had no time or room to bust holes in the concrete and install posts/bearers as you would normally do. Instead I bracketed the joists straight to the concrete slab. As it dropped down I was able to put a bearer in.

![20170515_103836.jpg](

Ryan the Scotsman screwing off the boards

20170515_093931.jpg!

Kane Watching me work

20170516_120016.jpg!

Framing out the steps

20170516_120028.jpg!

And boom! Sanded and coated. Looking great!

20170517_145013.jpg!

Thanks All! Hope you enjoyed

Coin Marketplace

STEEM 0.21
TRX 0.20
JST 0.035
BTC 91178.33
ETH 3192.43
USDT 1.00
SBD 2.96