Throwbackthursday: Construction - From Now To Seven Months Later

in #construction2 years ago

During this time of the year around me, the flood gates of heaven are usually left open. Staying two straight days without any rain is rare. That was the condition I found myself as we embarked on the construction you see below. It was two years ago that we were on the foundation level.

About seven months later, the final floor was set with the plastering on. That's a record for a work done during the rainy season.

IMG_20220630_205549.jpg

photocollage_2022630205834803.jpg

IMG_20220630_205530.jpg

IMG_20220630_205500.jpg

If you look at the first image closely, you will observe that the surrounding area of the trench collapsed. That's part of the challenges we faced but we were able to overcome it.

Have you experienced anything like that? Please share your experiences.

Coin Marketplace

STEEM 0.20
TRX 0.20
JST 0.034
BTC 90526.91
ETH 3112.25
USDT 1.00
SBD 2.96