bridge construction for 6 days hard work

in #civil7 years ago (edited)

image

good night all at this time i want to share a photograph of civil work on peratikum assembling steel bridge that we do for 6 days, 2 days making drawing through sap 2000 because need for calculation of dead load and live load only that i can share comments and uptoved my account and I want his help from

@good-karma
@esteem
@aceh
@indonesia

Coin Marketplace

STEEM 0.21
TRX 0.26
JST 0.040
BTC 100671.43
ETH 3655.73
USDT 1.00
SBD 3.14